Fameca FC2310 Disconnected Cable / Phase Vocal Identifier
- Perform off-voltage work on HV and LV networks
- Check the electrical map of a new network
This device allows cable operators to carry all operations related to the lockout-tag out job in a simple and safe way:
- Voice cable identifier
- Continuity controller
- Phase identifier
- Operating electrical map controller before commissioning
A multi-transmitter device with 9 available codes allows the allows:
- Verification with one receiver (gives certainty all involved pieces of the network of the same operation are correctly registered for the safety of the operators)
- Identification of the signal source (transmitter code no.).
- Improved workflow efficiency in the context of the lockout tag out procedure, by limiting the movements and movements of devices
- Checking of the new electrical map of the networks after works and prior to being re-energised. Example: Check that each LV distribution box is correctly connected by identifying the source of the signals (transmitter code no.)
Fameca FC2310 Key Features:
- Cable identifier for de-energized cables
- Secure signal: coded and confined between cable shorted ends, the transmitted signals cannot be jammed or detected on nearby cables
- Up to 9 different signal codes are programmable on the transmitters
- Secure voice message: It is paired to each transmitter code and is registered on the detector. It is issued only in case of confirmed identification of the transmitter code
- Simple signal induction: done by 3 transducer clamps on cable terminals at one of its ends as the cable is grounded and short-circuited at both ends (earthing switch or temporary grounding at both ends).
- Availability of information necessary for operations on facilities to be recorded or recorded, as soon as the transmitters are implemented and without any subsequent manipulation. No need of commuting between the job site and feeder pillar or substations until the end of the job.
- Check of network electrical map Within the framework of a recording and before putting back into service by using simultaneously the additional transmitter (B) antagonist included, the marking of the conductors can be carried out directly before cutting or on both sides of the section of the identified cable. Without having to move the transmitters with an indication of the origin. Example: In the case of a connection of a substation.
Fameca FC2310 Options:
Please see data sheet.